RACI Matrix Builder

For project managers and teams who want to settle who does what, and who has the final say, for every task.

Free, no sign-up. Runs in your browser: nothing is uploaded.

How to use RACI Matrix Builder

  1. Type your roles and tasks, one per line, or press Sample.
  2. Choose R, A, C or I in each cell of the matrix.
  3. Fix any warnings, then copy the Markdown table or download the CSV.

Features

  • Add up to 12 roles and 40 tasks
  • Checks: exactly one Accountable per task, at least one Responsible
  • Warns about idle roles, too many people Responsible and bottlenecks
  • Workload summary per role
  • Markdown copy and CSV download

Supported formats

Input

  • Typed lines
  • Chosen cells

You get

  • Markdown table
  • CSV

Private by design

Everything you enter is processed by your browser on this device. Nothing is sent to openWorkstand or anyone else, so the RACI Matrix Builder is safe for private and work data. After you have used it once while online, it also works without an internet connection. How local processing works

Good to know

  • The checks follow the usual rules (one Accountable, at least one Responsible); your organisation may use variants.
  • Up to 12 roles and 40 tasks.
  • Everything is built in your browser; nothing you type is sent anywhere.

Guide

A RACI matrix with rule checks: one owner per task and nobody idle

Most project delays are not about skill but about ownership: two people do the same thing, or everyone assumes someone else will. A RACI matrix puts names against tasks using four letters. R is Responsible, the person who does the work. A is Accountable, the one who answers for the result and has the final say. C is Consulted, a two-way conversation before a decision. I is Informed, told afterwards. This builder checks the matrix against the usual rules as you fill it in.

Building the grid

Type roles or people, one per line, up to 12, and tasks or deliverables, one per line, up to 40. A grid appears with one row per task and one column per role. Each cell has a drop-down: blank, R, A, A/R, C or I. A/R means the same person does the work and answers for it, which is common for small tasks. Press Sample for a worked example, or Clear to start again. The grid keeps your choices when you add or remove a line.

The rule checks

Above the grid and below the notes, messages appear as soon as a rule is broken. Each task needs exactly one Accountable person, counting A and A/R: none and two or more are errors. Each task needs at least one Responsible, counting R and A/R, and zero is an error. A task with more than three people Responsible gets a warning, and so does one with more than three Consulted, since too many cooks slow a decision. A role that appears in no task is flagged as idle, and, for matrices with four or more tasks, a role Accountable for more than 60% of them is flagged as a possible bottleneck. When everything passes, a message says so.

Workload by role

A table counts, for each role, the tasks where they are Responsible, Accountable, Consulted and Informed. It shows at a glance who is overloaded and who is hardly involved, which is a useful conversation to have before work starts.

Exports

“Copy as Markdown table” puts a table on the clipboard with a legend, ready for a wiki or a document, with A/R written as A/R and blanks as a dash. “Download CSV” saves a file with a header row of Task and the role names and one row per task. Roles, tasks and cells are saved in this browser so a reload does not lose them, and nothing is sent anywhere.

A worked example

The sample has five roles (project manager, designer, developer, client, QA lead) and five tasks. The project manager is A/R for writing the brief, Accountable for the designs and for testing, and Responsible for approving and launching. The designer is Responsible for the screens, the developer A/R for building, QA Responsible for testing, and the client Accountable for the final approval. Every task passes the rules, and the workload table shows the project manager as Responsible for 2 tasks, Accountable for 3, Consulted for 1 and Informed for none. If you change the designer’s cell on the first task from C to A, the page shows an error that the task has two Accountable people. The CSV for that task, before the change, reads “Write the project brief,A/R,C,C,C,”.

Getting value

Fill in the matrix with the people involved, not for them. Disagreements about who is Accountable are the point of the exercise. Keep tasks to deliverables and decisions, not every small action. Revisit the matrix when the team or scope changes, and share it where people will see it.

Limits

The checks follow the usual RACI rules, and your organisation may use variants such as RASCI or add a Support role. The tool does not assign people, track progress or send notifications. Large projects may need a tool with more structure than a 40-task grid.

Checked against the current version of the RACI Matrix Builder on .

Troubleshooting

The download did not start

Look for your browser’s download bar or icon. Some browsers ask once before a site may download files; allow it and click the button again.

Frequently asked questions

What should I do when two people both feel accountable?

Pick one. Accountable means the person who answers for the result and has the final say, and two owners usually means neither acts. Make the other person Responsible or Consulted. The builder flags a task with two As as an error so that the choice is made before work starts.

Is RACI useful for small teams?

Yes, for the handful of tasks where people often overlap or assume someone else is doing the work. You do not need a matrix for every task. Use it for the handoffs and decisions where confusion has cost you time before.

Can one person be both Responsible and Accountable?

Yes, and it is common on small tasks. Mark the cell A/R. What must never happen is two people Accountable for the same task, because then nobody owns the outcome.

What is the difference between Consulted and Informed?

Consulted people give input before a decision, in a two-way conversation. Informed people are told what was decided, one way, afterwards. Too many consulted people slow work down.

Keep working with the result

After you download, choose “Save to Workstand” to keep the result in a folder on your computer, attach it to a project and create a follow-up task. It is saved by your browser, not uploaded.