Guide
Julian Date, Julian calendar, Roman and Maya dates: one date in many systems
Dates look simple until you try to compare them across systems. Astronomers need a single count of days that is not tied to months and leap years. Historians have to convert between calendars. Programmers meet the Julian day number in file formats and libraries. This page takes one date and shows it in several of them at once, and converts back from a Julian Date.
The Julian Date
The Julian Date, JD, is a continuous count of days and fractions of a day starting at noon UTC on 1 January 4713 BC in the Julian calendar. Noon on 1 January 2000 is JD 2451545.0, an epoch called J2000. The Modified Julian Date, MJD, subtracts 2,400,000.5 to give smaller numbers that begin at midnight: 1 January 2000 at 12:00 UTC is MJD 51544.5. The Julian day number, JDN, is the whole number of the day, taken at noon. The page shows all three, and the weekday, which follows from the day number.
The Julian and Gregorian calendars
The Julian calendar had a leap day every four years. The Gregorian reform of 1582 dropped three leap days every 400 years, to keep the seasons in place, and skipped ten days: Thursday 4 October 1582 in the Julian calendar was followed by Friday 15 October in the Gregorian. Both are the day number 2299161 for the later date. Today the two calendars differ by 13 days, so 1 January 2000 was 19 December 1999 in the Julian calendar. Dates before 1582 are shown in the Gregorian calendar extended backwards, the proleptic Gregorian calendar, alongside the Julian date.
Roman dates
The Romans named days by counting back from three fixed points in each month: the Kalends on the 1st, the Nones on the 5th or 7th and the Ides on the 13th or 15th. The Nones and Ides fall a few days later in March, May, July and October. The day before a fixed day is pridie. Other days are counted back inclusively, so 21 December 2012 is a.d. XII Kal. Ian., the twelfth day before the Kalends of January. The page applies this to Gregorian dates with today’s month lengths; it does not reproduce the ancient doubled 24 February of leap years.
The Maya Long Count
The Long Count counts days from a mythical start in units of 20 and 18 by 20: 1 kin is a day, 20 kin a uinal, 18 uinal a tun of 360 days, 20 tun a katun and 20 katun a baktun of 144,000 days. A date is written baktun, katun, tun, uinal, kin. The page also gives the Tzolkin day, a number from 1 to 13 with one of 20 day names, and the Haab position in the 365-day year. It uses the standard correlation in which 0.0.0.0.0 is Julian day number 584283.
A worked example
With the default date 2000-01-01 at 12:00 UTC the page reports JD 2451545.00000, MJD 51544.50000, day number 2451545, the Gregorian date 1 January 2000, the Julian-calendar date 19 December 1999, a Saturday, the Roman date Kal. Ian., the Maya date 12.19.6.15.2 and a moon that is a waning crescent about 24.6 days old. For 21 December 2012 the Maya count is 13.0.0.0.0, 4 Ahau 3 Kankin. For 15 October 1582 the day number is 2299161 and the Julian date is 5 October 1582.
Converting back
Choose a Julian Date as input and type a number, such as 2460000, to get the Gregorian and Julian dates for it, here 24 February 2023. You can also type a date in the Julian calendar, which is how historical dates such as the Ides of March in 44 BC are written in sources.
Limits
Dates before 1582 are converted by the stated rules and do not reflect the calendar actually in use at the time. Other Maya correlations differ by a few days and are not offered. The moon phase is an approximation for dates between 1800 and 2200. Times are in UTC.
Related tools
Date Calculator adds and subtracts days. Age Calculator works out an exact age. Roman Numeral Converter writes numbers in Roman numerals, and Working Days Calculator counts working days.
Checked against the current version of the Julian Date Converter on .

