Strength comes from asking the body for slightly more over time: a little more weight, a few more reps or an extra set. This is called progressive overload, and without it progress stalls. A paper log makes it visible, since you can see what you lifted last week and what is planned this week. This page builds a printed log from your list of exercises, with the planned weight for each week and a line to write what you actually lifted.
Entering the plan
Write one exercise per line as name | sets | reps | starting weight | weekly increase, for example Squat | 3 | 5 | 60 | 2.5. Choose kilograms or pounds, the number of weeks to plan, up to 12, and whether to include a lighter deload week. Set a rounding step for the loads, such as 1.25 kg or 5 lb, so that weights are ones you can actually load, and choose A4 or US Letter paper. A title can be added, such as Strength log.
How the weights are planned
In each working week the planned load is the previous working load plus the weekly increase. With 60 kg and 2.5 kg a week, weeks 1, 2 and 3 are 60, 62.5 and 65. Each load is rounded to the nearest multiple of the rounding step. Beginners can often add weight every week or every session, and advanced lifters progress over months, so adjust the increase to your level. Zero is allowed for exercises you want to hold at one weight.
The deload
A deload is a lighter week that lets the body recover. When it is switched on, every fourth week replaces the working weight with 90 percent of the weight one step below, and the following week continues from where the plan left off. For the squat the third week’s working load is 65 and the next would be 67.5, so week 4 is (67.5 minus 2.5) times 0.9, which is 58.5, rounded to 58.75 kg. Week 5 is 67.5, and week 8 is the second deload at 65 kg.
A worked example
Press the first sample: five lifts over eight weeks in kilograms with a deload. The squat runs 60, 62.5, 65, 58.75, 67.5, 70, 72.5 and 65 kg. The bench press goes from 40 to 52.5 kg in week 7, the barbell row from 35 to 47.5, the overhead press from 25 to 31.25 and the deadlift from 80 to 105 kg, the heaviest planned load. The second sample is 12 weeks in pounds without a deload, rounded to 5 lb, with squats from 135 to 190 lb and deadlifts reaching 295. The third plans accessory lifts with 0.5 kg rounding.
Using the printed log
The page is landscape, with the exercise names and the sets and reps on the left and a column for each week. Each box shows the planned weight, bold, and a line beneath for the weight you actually lifted or your notes on reps and how it felt. Print several copies for a longer plan, or start a new log when the weeks run out. You can write the date and your name at the top.
Edge cases
Up to 14 exercises fit on a page, and each line must have all five fields, with sets and reps at least 1 and weights not negative. The rounding step can be from 0.25 to 10. A line with the wrong number of parts is rejected with its line number. The deload applies to every exercise in the same weeks.
Limits
The plan is arithmetic, and real progress is uneven. Sleep, food, stress, technique and injuries all change what you can lift, so treat the printed numbers as intentions. If a lift hurts, stop and see a doctor or physiotherapist, and learn heavy lifts with a coach or an experienced training partner. The page is a template and gives no medical or training advice.
Related tools
- One-Rep Max Calculator helps choose starting weights from a recent set.
- Warm-Up Sets Calculator plans the sets that come before each working weight.
- RPE Calculator adds effort to the plan when a planned weight feels too heavy or too light.