1. Home
  2. Converters
  3. Cubic Yards to Cubic Feet

Cubic Yards to Cubic Feet

For gardeners and builders who order materials by the cubic yard.

Free, no sign-up. Runs in your browser: nothing is uploaded.

Free workspace included. Docs, spreadsheets, notes and tasks that save on your device. No sign-up.Take a look

How to use Cubic Yards to Cubic Feet

  1. Type a value and check the two units.
  2. Read the result, the formula and the table.
  3. Copy the number, or swap the direction.

Features

  • yd³, ft³, m³, L, gal
  • Table 1/4 to 27 yd³
  • Cubic meters result
  • Swap direction
  • Exact: 1 yd³ = 27 ft³

Supported formats

Input

  • A typed number

You get

  • On-screen result
  • Copyable number
  • Reference table

Private by design

Everything you enter is processed by your browser on this device. Nothing is sent to openWorkstand or anyone else, so the Cubic Yards to Cubic Feet is safe for private and work data. After you have used it once while online, it also works without an internet connection. How local processing works

Good to know

  • The factor is an exact definition, so the only rounding is in the digits shown.
  • Material orders should include extra for waste and compaction.

Guide

Cubic yards to cubic feet for soil, gravel and concrete

Landscaping soil, mulch, gravel and ready-mixed concrete are sold by the cubic yard in the United States, while the plans that describe the job are drawn in feet or inches. Converting between the two is simple if you remember that a cubic yard is not three cubic feet. It is twenty-seven. A wrong factor here means a delivery that is far too small or far too large. This page does the conversion and gives the metric equivalents.

The factor

A yard is 3 feet, so a cube one yard on each side is 3 ft × 3 ft × 3 ft = 27 cubic feet. With the foot at 0.3048 m, a cubic yard is 27 × 0.028316846592 = 0.764554857984 m³, or 764.554857984 liters. The factors are exact, and the page states them in the formula line, for instance 5 yd³ × 27 = 135 ft³.

Using the converter

The page opens on 5 cubic yards and shows 135 cubic feet. An extra line shows the volume in cubic meters, 3.8228. The unit list adds liters and US gallons. Change the value, swap the direction to go from cubic feet to cubic yards, or choose different units from the menus. The decimals control fixes 2, 4 or 6 places, which is handy for ordering to a tenth of a yard.

From dimensions to cubic yards

To find the volume needed, measure the length, the width and the depth, all in feet, and multiply. A patio slab of 10 ft by 10 ft and 4 inches thick is 10 × 10 × (4 ÷ 12) = 33.33 cubic feet, which is 1.235 cubic yards. A garden bed of 20 ft by 5 ft covered 3 inches deep with mulch is 20 × 5 × 0.25 = 25 cubic feet, which is 0.926 cubic yards. Enter the cubic feet as the starting unit to see the yards.

The table

The table lists 0.25, 0.5, 1, 2, 3, 5, 10, 20 and 27 cubic yards with cubic feet. The values are 6.75, 13.5, 27, 54, 81, 135, 270, 540 and 729. 27 cubic yards is 729 cubic feet, which is 20.64 cubic meters. Any other value can be typed directly.

Worked examples

5 yd³ is 135 ft³, 3.82277 m³ and 3,822.77 L. 1 yd³ is 27 ft³ and 0.764554858 m³. A 2.5 yd³ load is 67.5 ft³. 100 ft³ is 3.7037 yd³. In metric, 1 m³ is 1.30795 yd³. For concrete, an order of 1.25 yd³ for the slab above would leave a little for spillage, though the exact margin is a decision for the contractor. Swapping the direction returns each figure.

Planning notes

The converter is arithmetic. It does not know how much a material compacts, whether a delivery is measured loose or compacted, or what a given depth requires for the job. Soil settles, gravel compacts and concrete needs a margin, and suppliers have their own rounding. Ask the supplier how they measure and whether to add a percentage. The page makes sure that the unit conversion itself is right.

Checked against the current version of the Cubic Yards to Cubic Feet on .

Frequently asked questions

How do I find how many cubic yards a job needs?

Multiply length, width and depth in feet to get cubic feet, then divide by 27. A bed 12 ft long, 4 ft wide and 3 inches (0.25 ft) deep is 12 cubic feet, so 0.44 cubic yards. Suppliers sell in whole or half yards, so round up, and add some extra for settling and waste.

Why is the answer so much bigger when I use yards?

Because volume scales with the cube of length. One yard is 3 feet, so a cubic yard is 3 × 3 × 3 = 27 cubic feet, not 3. Forgetting this and multiplying by 3 instead of 27 is the most common mistake in estimating materials, and is why the page has a prominent factor line.

How many cubic feet is a cubic yard?

Exactly 27, because a yard is 3 feet and 3 × 3 × 3 = 27.

How much concrete do I need?

Multiply length, width and thickness in feet to get cubic feet, then divide by 27. A 10 × 10 ft slab 4 in thick is 33.3 ft³, about 1.23 yd³. Order a little extra.

Keep working with the result

openWorkstand also includes a free workspace with documents, spreadsheets, tasks, projects and a calendar that save to a folder on your computer.